Vertical Stabilizer - Completed

801/01/2011
Hours: 8.1
VS total: 38.0

Finished Vertical Stabilizer!  ... On to the rudder.

Scott learns to shoot rivets on some scrap metal.  I needed his help doing the skin.  He did a fantastic job of it!
 Scott drilling some holes in the scrap metal, preparing for the rivets.
Front portion of the VS (depicted on top in the picture) complete with rivets installed.
The completed VS !!  Just imagine an airplane in front of this.
Another shot of the completed VS.
The completed VS from the back.  This is where the rudder will attach.


No comments:

Post a Comment