Horizontal Stabilizer

2/1/2011
Hours: 3.5
HS total: 13.1

Got doubler riveted to rear spar along with hinge brackets and elevator bearing.  Trimmed spar caps and stringers and deburred.

Rear spar showing bearing for elevator bolted in place and torqued.

Rear spar front side showing doubler.


Rear spar back side showing hinge brackets and bearing in the center.


No comments:

Post a Comment